Infrared transponder placement and precautions

Refer to the instruction manual of the infrared transponder for its installation instructions: First, determine the installation position of the infrared learning device, fix the device with a screw on the wall, and align the infrared emission window with the controlled home appliance. According to the installation location, it is determined that there is no shelter between the infrared learning device and the controlled device, and the wiring installation is completed.

Infrared transponder features

Small and exquisite appearance, no need for wiring, easy installation; support a variety of installation methods such as ceiling installation, wall-mounted installation; wireless signal stability; simple operation, that is, learning to use.

Infrared transponder placement and precautions

IR Repeater Installation Procedure

1) The infrared transponder can be placed directly on a fixed platform, which is flexible and convenient.

2) It can also be mounted in a fixed position - insert the pin into the fixing groove of the base.

3) Fix the base with expansion bolts.

4) Hold the main body on the pin.

5) Adjust the angle to complete.

Before and after installation of infrared learning equipment should pay attention to matters

Before using the infrared transponder, please install the battery first. Please pay attention to the positive and negative polarity when installing, and do not install it. High-capacity batteries are recommended. The correct connection and power supply must be provided. The detector will not work if power is lost for any reason. When you use it for the first time, please read the product manual carefully and install it.

Choose the installation location: 1 The infrared rays emitted by the wireless infrared transponder have certain angle restrictions in the vertical and horizontal directions. Determine the initial installation position of the transponder on the vertical surface. 2 After the initial installation position is determined, the actual control effect can be tested by referring to the methods in the operating instructions, and the installation position can be adjusted according to the test conditions.

The infrared transponder must be regularly maintained according to the requirements of the instructions; it should be installed in a dry, clean place, so as not to affect the effect of the use of internal components due to moisture or other debris; the surface is covered with dust, dry with a fine cloth, not Use corrosive cleaners and other chemical solvents.

Related browsing:

Article: 800 Smart Lock Instruction Manual

Recommended: Sodexo smart lock Smart lock agent Smart lock brand

Ground Screw Pile

Hot dip galvanized Ground Screw Pile ,Screw Pile ,Helical Screw Pile foundation materials are carbon steel Q235 (S 235 ) or Q355 ( S350) ,with hot dip galvanized finish treatment .

Helical Screw Pile ,Screw Pile ,Helix Screw Pile with one ,two three or four pieces big blade .blade diameter can be 300mm,350mm,360mm 450mm or any size as customers' design.

Screw pile foundation ,ground pile suitable for soft soil condition .

Screw Pile tube diameter : 76m,89mm,102mm,114mm,219mm.

Helical Screw Pile including Flange ground screw pile ,Flat nut ground screw pile .

Usuage : Screw Pile used in many fields ,such as Solar mounting system ,PV mounting ,fence ,housing construction ,road signs ,highway guardrail ,flagpole & .

solar screw pile

screw pile

screw pile designN screw pile design



Screw Piles ,Helical Screw Pile ,Screw Pile Foundation,Screw Pile Cost

BAODING JIMAOTONG IMPORT AND EXPORT CO., LTD , https://www.chinagroundscrew.com