Today, the chlorine dioxide generator manufacturers bring you the construction and installation of chlorine dioxide generators. I hope that everyone can help.
1) The generator and power distribution unit should be placed in separate rooms, and the room should have AC220V AC power.
2) The hydrogen generated by the generator should be discharged outside, the gate should be away from the fire source, and the safety explosion-proof lamp should be used for lighting in the operation room. The indoor should have good ventilation facilities.
3), the generator has a water inlet interface, the disinfection fluid interface, the diameter of the external pipeline should be consistent with it, and the disinfection fluid port needs to be equipped with a check valve.
4) The inlet pipe can be made of iron pipe or plastic pipe, and the pipe for discharging should be made of polyvinyl chloride or ABS plastic pipe.
5) There should be water supply and drainage facilities next to the generator.
6), pay attention to equipment grounding protection and other issues. There should be drainage facilities in the equipment room. And the equipment should have a simple anti-corrosion ground.
7) There should be a tap water source greater than 0.3Mpa.